Brighton Blvd Reconstruction
CLIENT:
Kiewit Infrastructure Co.
OWNer:
CCD
Services provided:
Quality Assurance Inspections
Field Materials Testing
Laboratory Testing
Construction Audits
Contractor Oversight
Project Close-Out (punchlisting)
PROJECT DESCRIPTION:
The Brighton Boulevard reconstruction project will construct critical public infrastructure and involve several main components of work; including 2 new 12’ lanes in each direction, 6 signalized intersections (29th, 31st, 33rd, 35th, 38th, and 44th streets), 80+ on-street parking spaces, 5’ wide continuous sidewalk, 6 ½’ wide continuous bike track, new landscaping, light fixtures and benches. This work too place along Brighton Boulevard, from 29th Street to 44th Street.